nude vol | angel technical

Nude Vol by Ulrike Quade |ANGEL by Eduardo de Paiva Souza

Nude Vol | Angel, are two pieces which are programmed as a double bill. To make the build-up of these two performances easier we combined the technical necessities in this technical rider.
The combined lighting plan comes as a separate document and has been send together with this technical rider.

Number of people: 2 performer, 2 technicians
Arrival technicians: 10.00 o'clock in the morning
Duration: Nude ± 35 minutes will play first
Angel ± 45 minutes will play second

Interval: Between performances there will be an interval of ± 30 minutes for scenery change. (White to Black)

Set up time: Hook-up of lights for Nude Vol | Angel - 3 hours
Angel Focussing lights & light cue's -1 ½ hour
Build-up off set NUDE Vol - 1 hour
(White floor+ hanging ropes + white cyclorama)
NUDE Vol Focussing lights & light cue's - 1 ½ hour
Strike time: 1 hour
Required technicians: 2 during set up and strike, 2 during the performance, and specially during the interval for the changing of the scenery

Brought by the company for the performance:
NUDE Vol
On the floor:
The set consists of 4 black metal poles standing separately in the space. Each pole has a height of 100 cm and has a diameter off 4 cm. Each of these poles is welded on a 2mm steel base plate ( 40 cm x 40 cm ). On each base plate a minimum of 36 kg has to be placed with, e.g. theatre weights and/or small sacks of sand as counterweights.
During the play five small artificial model fir-trees (10 cm – 20 cm height) are placed on floor by the performer. There's also 1 light objects (measurement approximately. 40cm x 40 cm x 40cm) It consists of 5 working lights, each constructed out off unbreakable safety plastic.
Hanging: In the grid there are 4 sets of 2 pulley's, each pulley is connected to a G-clamp. Through each set of pulley's a nylon rope, with a diameter of 10mm and a length of 20 meter , is connecting the puppet to one of the poles. Each poles has a slip clamp, preventing the rope from slipping away. (Yachting equipment) Each connection to the puppet has a loop and a snap hook. (Mountaineering equipment) The puppet with a weight of approximately 10 to 12 kg will hang statically on at least three ropes. It will be hoisted to a height off a minimum of 300 cm above the floor. In the event that spotlights are to be hung above the puppets hoisting area, the maximum hoisting height of the puppet will be limited mechanically to a distance off at least 60 cm underneath the spotlights.
We also use a video projector to project on the white cyclorama.
Depending heavily on the depth and height of the theatre venue, as well as rigging possibilities we can or can't use our own video projector. Our projector has 1300 ansiLumen and poor keystone facilities. Especially big venue's need extra care.
Thorough feedback with the technical manager of the theatre venue is necessary to tackle these video projection requests beforehand.

ANGEL
On the floor:
Autumn leaves on a black dance vinyl. No curtains. Some props on stage such as a broom, small (very small) piano, portable cassette player and stone block (made out of foam). We like to stick some Velcro tape on the back wall to put the angel on the wall at some point. 10 Minutes before opening we use a hazer.
Hanging: During the performance the angel will be hung against the back wall.

Needed from the theatre venue for both productions NUDE|ANGEL
Stage requirements
Dimensions:
Min. of 8m width x 8m deep x 4m height Max 10. of 10m width x 10m deep x 6m height
(Higher is possible but contact Paul Beumer, technician for Nude, for special rope arrangements)

Floor:
For Nude - a clean white ballet vinyl. (Clean because a lot of the movement material off player and puppet is on the floor. The puppet is white and very vulnerable for dirt.)
For Angel - a black ballet vinyl
Curtains:
For Nude a Black box
For Angel an open space without curtains
Backdrop - For Nude a clean white cyclorama
Divers: For Nude 140 to 160 Kg of counter-, braceweights for poles

Light requirements
Lighting desk Light computer Compulite - Photon
Spots :
12 Fresnell 1kW
16 PC 1kW (2 on the floor)
06 Profiles small angle (iris)
05 Profiles big angle
(25/50 5 with GOBO)
Dimmers 30 Dimmers
Color gels: Lee: 135-161- HT 119-182-HT 197-201-205-241-711

Sound requirements
mixer
A PA sound system with a mixing desk witch has at least 3 stereo line inputs 1 extra auxsend for in ear monitoringsystem (we bring iem)
1 stereo output.

other devices
1 Mini-disk players with auto-pause capabilities
1 CD player
1 DVD player
2 monitor speakers on stage as side fills.

Video requirements - Videoprojector Only for Nude: We want to project video sequences on the white cyclorama. As big as possible!

We, the company, have a simple video projector. Depending heavily on the depth and height of the stage and available rigging possibilities we can or can't use our own video projector. (Projector has it limitations. Simple keystone facilities and 1300 ansi lumen.)
Feedback with the technical manager of the theatre venue is necessary to find a solution beforehand.

Other
environment - completely dark and silent
control - sound and light are operated by one person, please put light and soundboard next to each other!
fire safety - during the performance of Nude there will be no firethe performance after the break, Angel, will start in a room filled with smoke. dressing room - clean dressing room with hot shower, near the stage.
stage temperature - ± 21 degrees Celsius.
To decide upon the technical possibilities off a performance in you're venue we kindly request you to provide us with:
- a technical drawing, featuring measurements of the stage and rigging positions, preferably a top and side view.
- an inventory list with brands and types of the available light an sound equipment

for additional technical information concerning the performance NUDE, please contact:
Paul Beumer
Dijkmanshuizenstraat 252
1024 XS Amsterdam
Telephone and Fax +31 (0)20 – 636 14 or mob. +316 23 26 34 12
e-mail digiscene@xs4all.nl

for additional technical information concerning the performance Angel, please contact:
Hans-C Boer
2e Leeghwaterstraat 2-II
1018 RA Amsterdam
Mob. tel +316 22 80 25 03
e-mail hans@laswerk.net